As & when require third party inspection is
offered.
Testing Facility
FOLLOWINGS TESTING FACILITY REQUIRED TO
OUR MAJOR CUSTOMER IN OUR HYDRAULIC
PRODUCTS MENTIONED BELOW
WE HAVE QUALIFIED TEAM OF WORK FORCE WHO
CONTROL & MEASURES QUALITY CHECK LIST FOR
ALL TYPES OF OUR HYDRAULIC & ENGINEERING
PRODUCTS :- WE GIVE YOU BRIEF HEREWITH
FOLLOWING INSTRUMENTS WE HAVE IMPLEMENTED AT
OUR WORKSHOP TO GIVE TQM
CALIBRATION STATUS / ACCURACY OF ALL THE
INSTRUMENT AND GAUGES VERIFIED BEFORE
COMMENCEMENT OF INSPECTION AND FOUND
SATISFACTORY / NOT FOUND SATISFACTORY
AQL - IS TOLERANCE LIMIT WITH IN +/- 0.001 TO
0.5 FOR ABOVE PART DIMENSION